Project Detail

Çallı Bridge Junction


The Çallı Bridge Junction, which was opened on February 11, 2017, provides uninterrupted and comfortable traffic flow at the intersection of the Antalya - Burdur route and the Antalya - Kemer route.

The 3-span bridge, with a length of 595 meters, is constructed with a 24-meter wide platform, and it employs the cable-stayed and inclined hanger (extradose) construction method.

​​​​​