Amasya Ring Road
The Amasya Ring Road, which was officially opened on July 25, 2020, spans a total length of 11.3 kilometers, significantly relieving traffic congestion within Amasya's city center.
As a result of this project, the 13.5-kilometer journey through the city, which used to take approximately 30 minutes, has been trimmed by 2 kilometers, reducing the travel time to around 7-8 minutes.
The Ring Road not only saves time and fuel but also contributes to a decrease in exhaust emissions by deactivating the signalization system and eliminating the need for frequent stops and starts.